Platform 1 (originating platform) | |||||||||||||
| Chinese name | |||||||||||||
| Chinese | 美的大道站 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Intersection of Yifeng Road (益丰路) and Midea Avenue (美的大道), Beijiao Subdistrict, Shunde District, Foshan, Guangdong China | ||||||||||||
| Coordinates | 22°56′51.47″N 113°12′8.60″E / 22.9476306°N 113.2023889°E / 22.9476306; 113.2023889 | ||||||||||||
| Operated by | Guangzhou Metro Group | ||||||||||||
| Line | Line 7 | ||||||||||||
| Platforms | 2 (2 side platforms) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| Other information | |||||||||||||
| Station code | 701-8 | ||||||||||||
| History | |||||||||||||
| Opened | 1 May 2022 (2022-05-01) | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Meidi Dadao Station (Chinese: 美的大道站; pinyin: Měidì Dàdào Zhàn; lit. 'Midea Avenue Station') is a station on Line 7 of Guangzhou Metro, located underground on the intersection of Yifeng Road and Midea Avenue in Foshan's Shunde District.[1] The station was opened on 1 May 2022, with the opening of the western extension of Line 7,[2][3] and is the southwestern terminus of the line.
The rails for the station connect to the nearby Yifeng Stabling Yard.[4]

Station layout
| G | Street level | Exits A, B, C, D |
| L1 Concourse & Platforms |
North Lobby | Ticket Machines, Customer Service, Police Station, Security Facilities |
| Side platform, doors will open on the right for alighting passengers only (Toilets, Nursery) | ||
| Platform 2 | ||
| Platform 1 | ||
| Side platform, doors will open on the right for boarding passengers only (Toilets, Nursery) | ||
| South Lobby | Ticket Machines, Customer Service, Police Station, Security Facilities | |
| L2 Mezzanine |
Connecting passageways | Non-paid connecting passage between both sides of the concourses, paid connecting passage between both sides of the platforms |
Entrances/exits
Meidi Dadao has 4 points of entry/exit, split between Exits A and D located at the west concourse and Exits B and C located at the east concourse. Exit C is accessible via elevator.[1]
-
Entrance A
-
Entrance B
-
Entrance C
-
Entrance D
History
During early planning, the planned terminus of Guangzhou Metro Line 7 westward to Beijiao in Shunde was originally planned to be located at Beijiao New Town station (now Beijiao Park), where it intersected with Foshan Metro Line 3. However, in later planning, it was determined that a stabling yard would be added to the western extension, and this station would be added at the same time, so this station became the official western terminus of Guangzhou Metro Line 7.
The station site began enclosure construction on 22 May 2017.[5] On 10 January 2020, the main structure topped out.[4] The station completed the "three rights" transfer on 21 October 2021, making it one of the first stations on the western extension of the line to do so.[6]
It opened on 1 May 2022 with the western extension of Line 7.[2]
During COVID-19 pandemic control rules at the end of 2022, due to the impact of prevention and control measures, station service was suspended from 28 to the afternoon of 30 November 2022.[7][8]
References
- ^ a b "美的大道" [Meidi Dadao]. Guangzhou Metro (in Simplified Chinese). Guangzhou Metro.
- ^ a b 李佳文 (30 April 2022). "广州地铁七号线西延段将于5月1日14时正式开通" [The western extension of Guangzhou Metro Line 7 will officially open at 14:00 on 1 May.]. New Express Daily (in Simplified Chinese). Archived from the original on 12 May 2022. Retrieved 15 May 2023.
- ^ "Guangzhou Metro Line 7 extension opens on May 1". GD Today. 2 May 2022. Retrieved 15 May 2023.
- ^ a b 朱朝贵 (13 January 2020). "广州地铁7号线西延顺德段第5座车站主体结构封顶" [The main structure of the fifth station of the Shunde section of Guangzhou Metro Line 7 West Extension has been completed.]. Foshan Daily (in Simplified Chinese). Archived from the original on 12 May 2022.
- ^ "今日顺德丨地铁又有新进展!7号线美的大道站5月22日开始施工" [Shunde Today - New progress on the subway! Construction on Line 7's Meidi Dadao Station will begin on 22 May.]. Southern Network (in Simplified Chinese). 17 May 2017. Archived from the original on 19 October 2022. Retrieved 2 November 2025.
- ^ "离开通又近了!广州7号线西延顺德段首批车站"三权"移交" [The first batch of stations on the Shunde section of Guangzhou Line 7 West Extension have been handed over to the government.]. Nanfang Daily (in Simplified Chinese). 22 October 2021. Archived from the original on 22 October 2021. Retrieved 15 May 2023.
- ^ 李天研 (28 November 2022). "白云海珠部分地铁站重开,番禺除南站之外全部地铁站暂停进出" [Some metro stations in Baiyun and Haizhu have reopened, and all metro stations in Panyu, except the South Station, have suspended entry and exit.]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 28 November 2022.
- ^ 李佳文 (30 November 2022). "广州地铁线网全面恢复正常运营" [Guangzhou Metro network fully resumes normal operations]. New Express Daily (in Simplified Chinese). Archived from the original on 30 November 2022. Retrieved 15 May 2023.
