| iE305 series CLI-225 series | |
|---|---|
iE305 series arrived at track 2 of Jayakarta station while conducting a test run on the Bogor Line. | |
| Stock type | Electric Multiple Unit |
| In service | 2025–present |
| Manufacturer | Industri Kereta Api |
| Built at | Madiun and Banyuwangi, Indonesia[1] |
| Replaced | |
| Constructed | 2024–present |
| Entered service | 16 December 2025 |
| Number under construction | 120 vehicles (10 sets) |
| Number built | 72 vehicles (6 sets) |
| Formation | 12 cars per trainset |
| Operators | KAI Commuter |
| Lines served | |
| Specifications | |
| Car body construction | Stainless steel |
| Car length | 20,000 mm (65 ft 7 in) |
| Width | 3,000 mm (9 ft 10 in) |
| Height | 3,985 mm (13 ft 0.9 in) |
| Doors | 4 doors on each side |
| Maximum speed | 120 km/h (75 mph) |
| Traction system | Toyo Denki RG6061-A-M VVVF-IGBT |
| Power output | 4000 hp |
| HVAC | INKA I-Cond 36,000 kcal (2 units per car) |
| Electric system(s) | 1,500 V DC overhead catenary |
| Current collection | Toyo Denki PT7206-A Pantograph |
| Bogies | INKA TB1622 (Trailer), INKA MB1122 (Motor) |
| Braking system(s) | Regenerative brake |
| Coupling system | Shibata Coupling |
| Track gauge | 1,067 mm (3 ft 6 in) |
The iE305 series,[2] also known as CLI-225 series,[3] is an electric multiple unit (EMU) commuter train type operated by KAI Commuter. This EMU is designed and manufactured by Industri Kereta Api (INKA) in Madiun and Banyuwangi, East Java,[1][4] in collaboration with Japan Transport Engineering Company (J-TREC).[5] This EMU uses technical specifications determined by the Directorate General of Railways (DJKA) of the Ministry of Transportation of the Republic of Indonesia.[4]
This EMU utilizes components sourced from both domestic and foreign production. In the electrical and equipment section, it uses components produced by Toyo Denki Seizo.[6] As for the braking system, it uses components produced by Nabtesco.[7][8]
The iE305 series has a formation of 12 cars on each trainset.[9]
History
KAI Commuter and PT INKA signed a contract for the production of 16 trainsets or 192 units of the iE305 series on 9 March 2023.[4] The delivery of the entire iE305 series will be carried out in stages from 2025 to 2027.[10]
The first trainset of the iE305 series was completed in early 2025. From 10 March to 12 March 2025, initial testing was conducted at the INKA factory in Madiun and Japan [9]
On 17 March 2025, the first trainset of the iE305 series was delivered from the INKA factory in Madiun to the Solo Jebres EMU Depot. Just a day before on 16 March 2025, the EMU was for the first time went outside the factory area and was exhibited to journalists at Madiun Station.[9] The Solo Jebres EMU Depot is a EMU Depot owned by the DJKA Railway Maintenance Center and managed by KAI Commuter.[11]
The delivery of each trainset is carried out in two phases, with each phase comprising six cars, pulled by a locomotive that is accompanied by several unmanned passenger cars to aid in braking.
_baru_buatan_PT._INKA,_EA205.jpg/440px-Kereta_Rel_Listrik_(KRL)_baru_buatan_PT._INKA,_EA205.jpg)
In the afternoon of 18 March 2025, the EMU underwent a short test run around Solo Jebres station. This short test run was carried out for the train driver to adapt to the train controls.[12]
In the early hours of 19 March 2025, the iE305 series for the first time underwent a full speed test at 120 km per hour on the Solo Jebres-Lempuyangan section of the Yogyakarta Line. Later in the afternoon, the test run continued on the Solo Jebres-Klaten section.[12] The test run was carried out by INKA, KAI Commuter and PT Surveyor Indonesia as consultants.[9]
On 16 April 2025, the first trainset continued its delivery from Solo Jebres Depot to Depok EMU Depot via Purwokerto, following the trial run on the Yogyakarta Line.[8][13]
_&_KRL_CRRC_seri_SFC120-V_(CLI-125)_in_Jakarta_Kota_station.jpg/440px-KRL_INKA_seri_EA207_(CLI-225)_&_KRL_CRRC_seri_SFC120-V_(CLI-125)_in_Jakarta_Kota_station.jpg)
On 21 April 2025, along with the SFC120-V series, the iE305 series was sent from Depok EMU Depot to Manggarai Station in preparation for the event commemorating the 100th anniversary of the first railway electrification in Indonesia on the next day. On 22 April 2025, the iE305 series was exhibited at Jakarta Kota Station, alongside the ESS 3200 class, SFC120-V series and various other EMUs.[14]

After previously being exhibited, the first trainset of the iE305 series resumed its trial run in Jabodetabek. The trial run began on the Bogor Line on Sunday night, 27 April 2025.[15] The trial was conducted by KAI Commuter together with Toyo Denki Seizo and Nabtesco.[8]
These trials follow the guidelines of the Ministry of Transportation Number 49 of 2023 concerning Standards, Test Procedures, and Certification of the Feasibility of Normal Speed Trains with Self-Driving. The tests consist of Design and Engineering Tests, Static Tests and Dynamics Tests.[16]
On 16 December 2025, the first and second trainsets of the iE305 series officially entered service, with a public trial run carrying passengers on the Bogor Line.[17]
Formations
Each trainset in the iE305 series comprises 12 cars. This configuration features two driver cabins situated in the first car and the twelfth car (the final car). These two cars are non-motorized and are classified as trailer cars with driver cabins (Tc).
Meanwhile, the other trains are divided into several types, namely:
- M1 and M2: Motor cars.
- T1, T2, and T3: Trailer cars.
In general, the standard formation configuration of the iE305 series is arranged as follows:
| Train Formation | ||||||||||||
| Car number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Numbering | CLI-225.X001 | CLI-225.X002 | CLI-225.X003 | CLI-225.X004 | CLI-225.X005 | CLI-225.X006 | CLI-225.X007 | CLI-225.X008 | CLI-225.X009 | CLI-225.X010 | CLI-225.X011 | CLI-225.X012 |
| Designation[18] | Tc1 | M1 | M2 | T1 | T2 | M1 | M2 | T3 | T1 | M1 | M2 | Tc2 |
| Weight (kg) | 34.100 | 37.600 | 37.100 | 33.000 | 30.100 | 37.600 | 37.100 | 29.600 | 33.000 | 37.600 | 37.100 | 34.100 |
Formation List
| Train Formation | ||||||||||||
| Car number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Designation[19] | Tc1 | M1 | M2 | T1 | T2 | M1 | M2 | T3 | T1 | M1 | M2 | Tc2 |
| CLI-225.1001F[20] | CLI-225.1001 K1 1 25 37 |
CLI-225.1002 K1 1 25 38 |
CLI-225.1003 K1 1 25 39 |
CLI-225.1004 K1 1 25 40 |
CLI-225.1005 K1 1 25 41 |
CLI-225.1006 K1 1 25 42 |
CLI-225.1007 K1 1 25 43 |
CLI-225.1008 K1 1 25 44 |
CLI-225.1009 K1 1 25 45 |
CLI-225.1010 K1 1 25 46 |
CLI-225.1011 K1 1 25 47 |
CLI-225.1012 K1 1 25 48 |
| CLI-225.2001F[21] | CLI-225.2001 K1 1 25 97 |
CLI-225.2002 K1 1 25 98 |
CLI-225.2003 K1 1 25 99 |
CLI-225.2004 K1 1 25 100 |
CLI-225.2005 K1 1 25 101 |
CLI-225.2006 K1 1 25 102 |
CLI-225.2007 K1 1 25 103 |
CLI-225.2008 K1 1 25 104 |
CLI-225.2009 K1 1 25 105 |
CLI-225.2010 K1 1 25 106 |
CLI-225.2011 K1 1 25 107 |
CLI-225.2012 K1 1 25 108 |
| CLI-225.3001F[21] | CLI-225.3001 K1 1 25 157 |
CLI-225.3002 K1 1 25 158 |
CLI-225.3003 K1 1 25 159 |
CLI-225.3004 K1 1 25 160 |
CLI-225.3005 K1 1 25 161 |
CLI-225.3006 K1 1 25 162 |
CLI-225.3007 K1 1 25 163 |
CLI-225.3008 K1 1 25 164 |
CLI-225.3009 K1 1 25 165 |
CLI-225.3010 K1 1 25 166 |
CLI-225.3011 K1 1 25 167 |
CLI-225.3012 K1 1 25 168 |
| CLI-225.4001F[22] | CLI-225.4001 K1 1 25 169 |
CLI-225.4002 K1 1 25 170 |
CLI-225.4003 K1 1 25 171 |
CLI-225.4004 K1 1 25 172 |
CLI-225.4005 K1 1 25 173 |
CLI-225.4006 K1 1 25 174 |
CLI-225.4007 K1 1 25 175 |
CLI-225.4008 K1 1 25 176 |
CLI-225.4009 K1 1 25 177 |
CLI-225.4010 K1 1 25 178 |
CLI-225.4011 K1 1 25 179 |
CLI-225.4012 K1 1 25 180 |
| CLI-225.5001F[23] | CLI-225.5001 K1 1 25 181 |
CLI-225.5002 K1 1 25 182 |
CLI-225.5003 K1 1 25 183 |
CLI-225.5004 K1 1 25 184 |
CLI-225.5005 K1 1 25 185 |
CLI-225.5006 K1 1 25 186 |
CLI-225.5007 K1 1 25 187 |
CLI-225.5008 K1 1 25 188 |
CLI-225.5009 K1 1 25 189 |
CLI-225.5010 K1 1 25 190 |
CLI-225.5011 K1 1 25 191 |
CLI-225.5012 K1 1 25 192 |
| CLI-225.6001F[24] | CLI-225.6001 K1 1 25 193 |
CLI-225.6002 K1 1 25 194 |
CLI-225.6003 K1 1 25 135 |
CLI-225.6004 K1 1 25 196 |
CLI-225.6005 K1 1 25 197 |
CLI-225.6006 K1 1 25 198 |
CLI-225.6007 K1 1 25 199 |
CLI-225.6008 K1 1 25 200 |
CLI-225.6009 K1 1 25 201 |
CLI-225.6010 K1 1 25 202 |
CLI-225.6011 K1 1 25 203 |
CLI-225.6012 K1 1 25 204 |
Gallery
-
Full interior of the iE305 series
-
Foldable priority seats and the wheelchair or stroller space
-
iE305 series during trial run on the Yogyakarta Line.
-
iE305 series EMU departing from Solo Jebres station.
-
iE305 series conducting a load test entering track 9 of Manggarai Station
-
iE305 series entering track 5 Kampung Bandan station.
-
A RG6061-A-M type propulsion inverter made by Toyo Denki Seizo.
-
A MB1122 motor bogie
-
A TB1622 trailer bogie
-
Several filled sacks were used to simulate the passenger load during rush hour on the train during the test run.
-
Several sensor cables are attached to the iE305 series to monitor the bogie's performance and send data to the technicians during the test run.
-
iE305 Series entering track 2 of Duren Kalibata station during test run
See also
References
- ^ a b Media, Kompas Cyber (26 September 2024). "KCI Butuh Pengadaan 37 KRL hingga 2027, Mayoritas Dipesan dari INKA". KOMPAS.com (in Indonesian). Archived from the original on 22 November 2024. Retrieved 12 July 2025.
- ^ "INKA Proudly Present, KRL karya anak bangsa series iE305". PT INKA Persero on Facebook (in Indonesian). 30 April 2025. Retrieved 30 April 2025.
- ^ 実は日本技術の結晶「インドネシア製電車」の中身 中古車両導入は途絶えても「日本式」に高い信頼 [Japanese technology "crystallizes" in Indonesian trains]. Toyo Keizai Online (in Japanese). 5 April 2025. Retrieved 5 April 2025.
- ^ a b c antaranews.com (8 February 2024). "KAI Commuter: 92 persen pengadaan KRL bekerja sama dengan INKA". Antara News (in Indonesian). Retrieved 18 March 2025.
- ^ "Ujung-ujungnya Teknologi Jepang". Tempo (in Indonesian). 10 April 2023. Retrieved 18 March 2025.
- ^ Denki, Toyo (30 November 2023). "Notice on Orders Received for Electrical Equipment of New Rolling Stock for Commuter Railway in Indonesia" (PDF). Toyo Denki. Retrieved 18 March 2025.
- ^ "PT INKA Tampilkan KRL Baru Jabodetabek". YouTube. CNN Indonesia. 25 February 2025. Retrieved 17 April 2025.
- ^ a b c antaranews.com (16 April 2025). "PT INKA uji coba KRL pesanan KAI Commuter di perlintasan Jabodetabek". Antara News (in Indonesian). Retrieved 17 April 2025.
- ^ a b c d antaranews.com (16 March 2025). "PT INKA uji coba KRL Jabodetabek di perlintasan Solo Jateng". Antara News (in Indonesian). Retrieved 18 March 2025.
- ^ Priambada, Yulius Brahmantya (6 April 2023). "Jalan Panjang Polemik Impor KRL Bekas (Bagian 1)". kompas.id (in Indonesian). Retrieved 18 March 2025.
- ^ https://www.rri.co.id/daerah/859919/krl-solo-yogya-miliki-depo-di-jebres-solo-kerja-sama-dengan-djka
- ^ a b Sulistyo, Bayu Tri (19 March 2025). "Rangkaian KRL Seri CLI-225 Jalani Uji Dinamis Perdana". Railway Enthusiast Digest (in Indonesian). Retrieved 18 April 2025.
- ^ Sulistyo, Bayu Tri (16 April 2025). "Rangkaian Pertama KRL Seri CLI-225 Dikirim ke Depok". Railway Enthusiast Digest (in Indonesian). Retrieved 17 April 2025.
- ^ antaranews.com (22 April 2025). "KAI Commuter hadirkan parade KRL lawas rayakan 100 tahun operasi KRL". Antara News (in Indonesian). Retrieved 24 April 2025.
- ^ Sulistyo, Bayu Tri (29 April 2025). "Rangkaian Pertama KRL Seri CLI-225 Jalani Uji Dinamis di Jabodetabek". Railway Enthusiast Digest (in Indonesian). Retrieved 29 April 2025.
- ^ "Permenhub No. 49 Tahun 2023". Database Peraturan | JDIH BPK. Retrieved 12 March 2025.
- ^ Liputan6.com (16 December 2025). "KAI Commuter Operasikan 2 KRL Baru Made in Indonesia untuk Rute Bogor". liputan6.com (in Indonesian). Retrieved 16 December 2025.
{{cite web}}: CS1 maint: numeric names: authors list (link) - ^ "KERETA REL LISTRIK INKA SERI iE305". www.instagram.com. 20 May 2025. Retrieved 1 July 2025.
- ^ "KERETA REL LISTRIK INKA SERI iE305". www.instagram.com. 20 May 2025. Retrieved 1 July 2025.
- ^ AfifFahreza (19 April 2025), KRL BARU BUATAN INKA MADIUN SAMPAI DEPOK || Pengiriman Ke Dua KRL INKA EA 207 Trainset Pertama, retrieved 21 April 2025
- ^ a b Feryan Adi Anggana (15 June 2025), iE305 TRAINSET 3 KLAKSON BEDA? TAKSAKA SELESAI RECALL? iE305 SIAP KIRIM 😱😱, retrieved 20 June 2025
- ^ Feryan Adi Anggana (22 July 2025), TRAINSET TERAKHIR PRODUKSI MADIUN 🤔 | Hunting Langsiran iE305 Trainset 4, retrieved 23 July 2025
- ^ Feryan Adi Anggana (22 September 2025), BAGIAN KEPALA KRL TIBA DI INKA MADIUN 😱 | Pengiriman KRL INKA iE305 Trainset 5 Unit 8, retrieved 24 September 2025
- ^ Feryan Adi Anggana (30 September 2025), MOMEN BERTURUT TURUT😱 | KLB Uji dinamis SSNG Trainset 35 Dan Pengiriman iE305 Trainset 6, retrieved 30 September 2025
External links
- Technical specifications of the iE305 series on Instagram